About your Search

20121201
20121231
Search Results 0 to 8 of about 9 (some duplicates have been removed)
a creek within the snow regional wilderness area. the purpose of the project is to replace an existing wooden bridge with a new concrete and steel bridge that can accommodate vehicular and pedestrian traffic. the existing bridge was constructed in the 1930s and refurbished in the 1960s. the maximum loading capacity is limited to 8 tons and this restricts fire, maintenance, and cattle transport vehicles from accessing the bridge. these vehicles must use a nearby low water creek crossing to access facilities within the watershed and can only do so when water levels allow. we have been working with various agencies to eliminate low water creek crossings within our watershed and this is one of them. the main purpose of the project is to construct a new bridge that can accommodate up to 63 ton loading, eliminate the need for vehicles to cross through alameda creek and thereby enhancing the conditions of alameda creek and allow year round access and decrease long term maintenance costs associated with the wooden bridge. a mitigated negative declaration was prepared according to the citi qua
Search Results 0 to 8 of about 9 (some duplicates have been removed)